top of page
01
The Challenge
Access to the station from the main road was limited to a 600mm wide pathway which was often obstructed by over-hanging parked cars.
02
Our Solution
Reconfigure the car park to make space for a wider pathway without loosing excessive numbers of parking bays
03
The Outcome
Wider pathway access for customers, with bump stops to stop cars impeding on pathway.
Project Gallery
bottom of page









